A Cutting-Edge Project in the Construction Sector
In the Levante Ligure area, in Chiavari, we had the opportunity to build one of the first buildings to be constructed entirely using the drywall system, a cutting-edge technology that combines sustainability, high performance, and speed of execution. In this project, we adopted advanced solutions to ensure thermal and acoustic insulation, energy efficiency, and aesthetic quality, confirming our expertise in the drywall construction sector.
This construction method, which does not use traditional masonry, required the use of metal framing and gypsum board panels that allowed us to:
Advanced Construction Solutions
We handled the entire external envelope of the building, as well as the construction of:
Innovation and Sustainability
This project represents a model of modern and sustainable construction, combining speed of execution, high insulation performance, and quality architectural solutions.